This list contains declaratory statements submitted to the Florida Building Commission that cite the 2007 Florida Building Code and its supplements ( ie 2009) If you have any questions please contact our offices at 850-487-1824
|
DEC # Assigned |
Clerk |
Status |
Section |
Topic |
First Hearing |
Second Hearing |
TAC/ POC |
Comments |
|
Are permits required to install or replace water heaters? |
|
|
|
Keywords : Gas, electric, water heater, permit |
|||
|
What is the cut off date for constructing buildings to previously approved plans after implementation of the new codes on December 31, 2008? |
|
Affirmed |
|
Keywords : manufactured building, modular building, permit, 105.3, Part I, Chapter 553, FS |
|||
|
Dismissed |
How is threshold building defined? |
|
|
|
Keywords : [Past requests] Outside the scope of the declaratory process. |
||
|
Withdrawn |
Is an architect or engineer bound by the rules governing private providers? |
|
--- |
|
Keywords : |
||
|
Is windborne debris protection required for residential renovation? |
|
Affirmed |
Code Admin |
Keywords : |
|||
|
Is windborne debris protection required for residential renovation? |
|
Affirmed |
Code Admin |
Keywords : FS 553.884 |
|||
|
Withdrawn |
|
Delegating signature for signing building permit applications. |
|
--- |
|
Keywords : FS 713.135(6) |
|
|
Withdrawn |
Is an architect or engineer bound by the rules governing private providers? |
|
--- |
|
Keywords : |
||
|
labeling provisions for windows, sliding glass doors and skylights |
|
Affirmed |
Code Admin |
Keywords : originally DCA08-DEC-140 and renamed to DCA08-DEC-142 FS163 |
|||
DCA09-DEC-257 | 07/09 | Final Order | 0608 LglRpt |
M Thomas Work performed, permitting | ||||
DCA09-DEC-259
|
Request to Postpone |
105.1 | Mesh Signage on exhisting building Murals
|
|||||
DCA09-DEC-260 | Final | 101.2
|
Permitting required for Generator enclosure Advanced Manufact |
|||||
DCA09- DEC-269 |
FBC13-413.1, |
Clarification of descrepancy between NEC and FBC Codes
|
LglRpt 1009 |
Percent voltage drop
|
||||
DCA09- DEC-309 |
09/09 | Final |
2007 FBC | Does FBC Exhisting Building Code apply to renovations to exhisting swimming pools | LglRpt 1009 |
|||
DCA09- DEC-347 |
Final | 0210 LglRpt | ||||||
DCA10- DEC-059 |
Florida Building Code , Building - Chapter 2
DEC # Assigned |
Clerk Date | Status |
Section |
Topic |
First Hearing |
Second Hearing |
TAC/ POC |
Comments |
|
|
|
|
|
|
Keywords : Non-occupancy generator enclosures and if DEC-260 is required. If yes, what is procedure to meet requirement? |
Florida Building Code , Building - Chapter 4
DEC # Assigned |
Clerk Date | Status |
Section |
Topic |
First Hearing |
Second Hearing |
TAC/ POC |
Comments |
|
Deferred to local appeals board |
For stages < 1000 sq ft, what is the effect of the proscenium wall on stage area when calculating the roof vent? |
|
--- |
Fire |
Keywords: 2004 FBC Deferred to the local appeals board |
||
|
Withdrawn |
603.1.4? |
Fire rated sheathing replacement product for schools |
|
|
|
Keywords : |
|
DCA09- DEC-420 |
Withdrawn | 0210 LglRpt |
Keywords : | |||||
|
Florida Building Code , Building - Chapter 5
DEC # Assigned |
Clerk Date | Status |
Section |
Topic |
First Hearing |
Second Hearing |
TAC/ POC |
Comments |
|
Is occupation separation required for training rooms if they are > 750 sq ft for a single tenant, second floor, sprinklered space? |
|
|
|
Keywords : NFPA 101 |
Florida Building Code , Building - Chapter 9
DEC # Assigned |
Clerk Date | Status |
Section |
Topic |
First Hearing |
Second Hearing |
TAC/ POC |
Comments |
|
Automatic sprinkler systems in educational facilities. |
|
Affirmed |
Fire |
Keywords:
|
|||
DCA09-DEC-214 | 05/29/09 | 903.2.7 NFPA101 |
Fire Sprinkler Requirement | 0809 Lgl Rpt | Fire | Keywords: Fire Sprinkler Requirement,General Home Development Catholic Church |
Florida Building Code, Building - Chapter 10
DEC # Assigned |
Clerk Date | Status |
Section |
Topic |
First Hearing |
Second Hearing |
TAC/ POC |
Comments |
DCA09- DEC-419 DEC-419 Amendment |
Final Analysis | 0210 LglRpt |
Keywords : |
Florida Building Code , Building - Chapter 12
DEC # Assigned |
Clerk Date |
Status |
Section |
Topic |
First Hearing |
Second Hearing |
TAC/ POC |
Comments |
|
Lighting for a tanning booth in a strip mall. |
|
|
Fire |
Keywords:
|
Florida Building Code , Building - Chapter 13 Energy Efficiency
DEC # Assigned |
Clerk Date |
Status |
Section |
Topic |
First Hearing |
Second Hearing |
TAC/ POC |
Comments |
|
Withdrawn |
13-102.2 |
Above ground HVAC duct in mobile homes |
|
|
Energy |
Keywords:
|
Florida Building Code , Building - Chapter 15
DEC # Assigned |
Clerk Date | Status |
Section |
Topic |
First Hearing |
Second Hearing |
TAC/ POC |
Comments |
Withdrawn |
Is underlayment required for storage sheds? |
|
Affirmed |
Roofing Fire |
Keywords:
|
|||
|
Is double underlayment required for 4:12 slope? |
|
Affirmed |
Roofing |
Keywords:
|
|||
Draft Order | Deferred to August 09 Meeting |
The HVHZ is not allowing pre-mixed lightweight mortar type adhesive for installing hip and ridge tile. |
|
|
|
Keywords : FL 7233 and FL 520 |
Florida Building Code , Building - Chapter 16
DEC # Assigned |
Clerk Date | Status |
Section |
Topic |
First Hearing |
Second Hearing |
TAC/ POC |
Comments |
|
Building 1609 Mechanical 301.13 |
Is the manufacturer of outdoor appliances responsible for designing to resist wind pressure? Does s.301.13 require appliances exposed to wind to be designed and installed according to s.1609? |
|
Affirmed |
Structural |
Keywords: DCA07-DEC-182 DCA07-DEC-183 |
||
-----------------
|
|
Can a sunroom be built as partially enclosed. Can a structure with its own new roof be built as partially enclosed? Does a partially enclosed structure have to be shuttered? A conservatory cannot be built under an existing roof or deck so how does this apply to 1609.1.2 |
|
Affirmed |
Structural |
Keywords: sunroom |
||
-----------------
-----------------
|
|
Building 1609.4.3 Residential R301.2.1.4 |
For Exposure C, does the 20% increase in uplift load apply to the continuous load path from the roof sheathing to the foundation or does it apply to two specific locations? |
|
Affirmed |
Structural |
Keywords: |
|
|
If no ducts are attached to a louver, are there impact requirements outside HVHZ? Above 30 ft? Is cyclic loading, as well as static test, required after the impact test? |
|
Affirmed |
Structural |
Keywords: |
Florida Building Code , Building - Chapter 17
DEC # Assigned |
Clerk Date |
Status |
Section |
Topic |
First Hearing |
Second Hearing |
TAC/ |
Comments |
|
Withdrawn |
Testing and labeling exterior windows and glass doors |
|
Affirmed |
Structural |
Keywords: |
||
|
Withdrawn |
Garage door labeling. |
|
--- |
Structural |
Keywords: Withdrawn by petitioner |
||
DCA09- DEC-411 |
Deferred until next meeting | 0210 LglRpt |
Florida Building Code , Building - Chapter 20
DEC # Assigned |
Clerk Date | Status |
Section |
Topic |
First Hearing |
Second Hearing |
TAC/ |
Comments |
|
Withdrawn |
16, 20 |
Designing screen enclosure with removable screen panels |
|
--- |
Structural |
Keywords : |
Florida Building Code ,Chapter 23
DEC # Assigned |
Clerk Date | Status |
Section |
Topic |
First Hearing |
Second Hearing |
TAC/ |
Comments |
|
|
|
|
|
|
|
Keywords : M2301.2.3 re:Solar Systems Tempreature and Relief Protection |
Florida Building Code ,Chapter 27
DEC # Assigned |
Clerk Date | Status |
Section |
Topic |
First Hearing |
Second Hearing |
TAC/ |
Comments |
|
Withdrawn |
|
|
|
|
|
Keywords : Requirement for power panels in pool rooms to be NEMA rated Type 1, 3R and 4X |
Florida Building Code , Building - Chapter 31
DEC # Assigned |
Clerk Date | Status |
Section |
Topic |
First Hearing |
Second Hearing |
TAC/ |
Comments |
|
What is the location of the lowest horizontal structural member? What design ratio is allowed? |
|
Affirmed |
Structural |
Keywords : DEP |
|||
DCA10- DEC-045 |
Withdrawn | FBC3109 and FS161.053(12)FDEP 62B-33.007(4). 2 proposed projects on the Gulf coast barrier islands, seaward of the FDEP/FBC coastal construction control line. | ||||||
DCA10-DEC-091 | FBC 3109, FBC3110 and FS161.053(12) FDEP 62B-33.007(4). 2 Proposed projects on the Gulf Coast barrier islands, seaward of the FDEP/FBC coastal construction control line. |
Florida Building Code , Existing Building
DEC # Assigned |
Clerk Date | Status |
Section |
Topic |
First Hearing |
Second Hearing |
TAC/POC |
Comments |
|
|
Repair consisting of more than 50% building area has no bearing on definition of repair or alteration. Please see Alteration Level 1. |
|
Affirmed |
|
Keywords: |
||
|
611.7.1 |
The required 0.141 diameter nail is not readily available nor does it work in Pneumatic nail guns. 8D .141 nail is a typo and should be .131 8d nail |
|
Affirmed |
Roofing TAC
|
Roofing TAC discussed on February 24
Keywords: 8d nail |
||
|
611.8 |
When the cost exceeds 15%, does s.611.8.1.7 enforce partial improvement? Do gable ends or hip corners have priority? |
|
Affirmed |
Roofing TAC
|
Roofing TAC discussed this February 24, 2009 Keywords : |
||
Florida Building Code , Fuel Gas
DEC # Assigned |
Clerk Date | Status |
Section |
Topic |
First Hearing |
Second Hearing |
TAC/POC |
Comments |
|
Withdrawn |
Laws and Rules |
The Florida Propane Gas Association (FPGA) requests interpretation of the applicability of various compliance requirements of the code with respect to propane (LP gas) propane, lp gas tanks, cylinders or containers being classified as a “structure” rather than “equipment or fixtures” |
|
--- |
Structural |
Keywords: propane, lp gas tanks, cylinders or containers being classified as a “structure” rather than “equipment or fixtures” 5F-11.002 |
Florida Building Code , Mechanical
DEC # Assigned |
Clerk Date | Status |
Section |
Topic |
First Hearing |
Second Hearing |
TAC/POC |
Comments |
|
Is a storage room that is not air conditioned required to have mechanical ventilation if the floor area is < 4% the area of the exterior door? |
|
Affirmed |
Mechanical |
Keywords : |
Florida Building Code , Plumbing
DEC # Assigned |
Clerk Date | Status |
Section |
Topic |
First Hearing |
Second Hearing |
TAC/POC |
Comments |
|
|
|
Grease interceptors must be designed in accordance with PDI G 101, ASME A112.14.3 and s. 1003.5 |
|
Affirmed |
|
Keywords : 64E-6.013 |
|
|
Final | Building 309.1 Plumbing 403.2 |
Does a food service establishment have to provide separate facilities since it seats 11 or > 10 seats? |
|
|
|
Keywords : food service establishment |
Florida Building Code , Residential
DEC # Assigned |
Clerk Date | Status |
Section |
Topic |
First Hearing |
Second Hearing |
TAC/POC |
Comments |
|
withdrawn |
Define open for sunroom. |
|
--- |
Structural |
Keywords : |
||
|
|
Regarding whether a glass sunroom with a glass roof is a non-habitable structure; whether a non-habitable structure it can be built as partially enclosed; and what categories of sunrooms are required to be shuttered. |
|
Affirmed |
Structural |
Keywords: Sunroom, shutter, protection, partially enclosed
|
||
|
|
Regarding whether a glass sunroom with a glass roof is its own entity (structure), should it be built as partially enclosed and shuttered? |
|
Affirmed |
Structural |
One addendum Keywords: Sunroom, shutter, habitable, space |
||
|
|
Venting to the outside |
|
Affirmed |
Mechanical |
Keywords : |
||
|
Withdrawn |
The residential code should allow a 2 inch overlap in the drip edge as in the building code. |
|
--- |
Roofing |
Keywords : 2004 |
||
DCA10- DEC-034 |
M2301.2.3. | Pertains to placement of Pressure and Temperature Relief Valves (P&T Valves) within a solar water heating system | ||||||
DCA09_ DEC-351 |
0210 LglRpt |
_____________________________________________________________________________________
Florida Statutes
DEC # Assigned |
Clerk Date | Status |
Section |
Topic |
First Hearing |
Second Hearing |
TAC/POC |
Comments |
|
|
Private provider limitations |
|
Affirmed |
Mechanical |
Keywords : |
______________________________________________________________
Rule Declaratory Statements
Rule 9B-3.0472 Declaratory Statements
DEC # Assigned |
Clerk Date | Status |
Section |
Topic |
First Hearing |
Second Hearing |
TAC/ POC |
Comments |
Is it the intent of Rule 9B-3.0472 to require CO detection within 10' of all sleeping rooms throughout this entire facility |
|
Affirmed |
Mechanical |
Keywords: CO detector |
||||
----------------
| Does the rule apply only to new construction of a new building or does it also apply to additions or alterations as defined in the FEBC
|
|
Affirmed |
Mechanical |
Keywords: alteration, new construction, 9B-3.0472 For the February meeting the petitioner has requested the following: The petitioner requested that the response time of Chapter 120 Procedure for this Declaratory Statement be extended until June 1 st 2009, with the understanding that the extension will not result in the dismissal of the Declaratory Statement. |
|||
How is the criteria for attached garages and fossil fueled appliances to be interpreted in a high density or high rise residential building |
|
Affirmed |
|
Keywords: |
||||
DCA08-DEC-344
|
Withdrawn |
In new construction (a) any carbon monoxide detector listed or labeled ANSI/UL 2075 shall be installed, or (b) any listed or labeled ANSI/UL 2034 carbon monoxide alarm that receives its primary power from the building wiring shall be installed, provided that the ANSI/UL 2034 listed or labeled carbon monoxide alarm shall have a secondary power backup |
|
--- |
Mechanical |
Keywords: carbon monoxide detector |
Rule 9B-3.0475 Declaratory Statements
DEC # Assigned |
Clerk Date | Status |
Section |
Topic |
First Hearing |
Second Hearing |
TAC/ POC |
Comments |
|
For HVHZ and Non HVHZ zones, does the approval basis for the underlayment referenced in Section 201.2, item (c) of Rule 9B-3.0475 is based on compliance with Florida Building Code Section 1518.4 and Residential Code section R4402.7.4? |
|
Affirmed |
Roofing |
Keywords: underlayment |
Rule 9B-72 Declaratory Statements (State Product Approval)
DEC # Assigned |
Clerk Date | Status |
Section |
Topic |
First Hearing |
Second Hearing |
TAC/ POC |
Comments |
|
|
Construction systems that use forms to form the wall systems on site fall within the scope of Rule 9B-72; however structural wall systems constructed to fit specific plans and design standards are outside the scope of Rule 9B-72. |
|
Affirmed |
Product Approval |
Keywords: |
||
|
|
The product falls outside the scope of Rule 9B-72 because it is assembled and placed in the field |
|
Affirmed |
Product Approval |
Keywords: |
||
|
|
The Administration Validation Checklist for the certification method indicates the standard listed on the certificate complies with the standard referenced in the code. |
|
Affirmed |
Product Approval |
Keywords: |
||
|
Dismissed |
Is an expired Agency Certificate applicable? |
|
--- |
|
Keywords : |
||
|
|
In the wind borne debris region but outside HVHZ, 1609.1.2.1 does not require louvers located more than 30 feet above grade, and louvers not attached to ducts, to demonstrate impact resistance. The static test is required. |
|
Affirmed |
Structural |
Keywords: See DCA08-DEC-237. |
||
|
Louvers are subject to the requirements of the code including structural windload requirements. Rational analysis cannot be used in lieu of testing. |
|
Affirmed |
Structural |
Keywords: See DCA04-DEC-219 for custom one of a kind louvers which are outside the scope of Rule 9B-72. |
|||
|
|
Large impact test is required for louvers 30 feet and below [for nursing homes and hospitals]. The cyclic wind pressure test is not required for louvers. |
|
Affirmed |
Structural |
Keywords: See DCA08-DEC-237. |
||
|
|
Products used in the HVHZ must comply with the requirements of the HVHZ. However, the code does not impose impact requirements for the louvers beyond consideration of ASCE 7 design standards. |
|
Affirmed |
Structural |
Keywords: See DCA08-DEC-237.
|
||
|
|
The product falls outside the scope of Rule 9B-72. |
|
Affirmed |
|
Keywords : |
||
|
|
Bamboo poles fall outside the scope of Rule 9B-72 |
|
Affirmed |
|
Keywords : |
||
|
|
Spray foam products fall outside the scope of Rule 9B-72. |
|
Affirmed |
|
Keywords : |
||
|
Dismissed
|
A testing laboratory would like to become a validation entity and a quality assurance entity. |
|
--- |
Product Approval |
Keywords : |
||
|
Deferred
Dismissed |
Product Approval, does the one coat exterior limestone finish fall under the scope of Rule 9B-72? |
|
Affirmed |
Product Approval |
Keywords: Product Approval |
||
|
Dismissed |
Building panel used as a structural member |
|
--- |
Product Approval |
Keywords : Outside the scope of Declaratory Statements |
||
|
If the test standard has not changed, does the product need to be retested even though the date of the test has expired? |
|
|
|
Keywords : Expired, test report |
|||
DCA09-DEC341 | Deferred to Dec 09 FBC meeting | Created lumber product for outdoor decking | 0210 LglRpt | Life Time LLC : |
||||
DCA09- DEC-254 |
Final |
E-1996-05 |
Bahama Storm Shutter Porous and Non Porus Protective Assemblies |
1009 Lglrpt | Bahama Storm Shutter |
|||
DCA09- DEC-263 |
Final |
|
Wind strips for roof edge | 1009 Lglrpt | Wind strips for roof edge | |||
DCA09_ DEC-375 |
||||||||
DCA09-DEC-410 | Dismissed | |||||||
DCA10-DEC-042 | Withdrawn
|
Superior Shield, HR20 a Fluropolymer Coating Product falls under the Scope of Rule 9B-72 | ||||||
___________________________________________________________________________________________
Other
DEC # Assigned |
Clerk Date | Status |
Section |
Topic |
First Hearing |
Second Hearing |
TAC/POC |
Comments |
SMF#10416309-FM |
|
FS 553.73(10)(d) |
Bonita Springs Project by Bill R. Moore, Waldrop Group |
|
|
|
Keywords : Local interpretation conflict. |
|
Withdrawn |
RAS 118.3.11, 119.3.12, 120.3.10 |
Top notch supports for hip and ridge tile |
|
--- |
|
Keywords : 2004 FBC |
||
|
Dismissed |
|
Automatic sprinkler systems in educational facilities. |
|
--- |
|
Keywords : 69A-80.007, 2004 FFPC |
|
|
|
|
Add an option for installing eave flashing. |
|
|
Roofing |
Keywords : Code modification |
|
DCA08-DEC-360
|
Denied |
|
|
|
--- |
|
Keywords : Only found in the legal report. No valid concern was provided. |
|
|
Dismissed Commission has no authority to take up |
304.2.2 305 |
Assembly occupancy < 100 persons, historic building |
---- |
|
Keywords : 1997 Standard Building Code Cannot address local ordinances, no authority to take up. |
||
DCA |
|
|
|
|
|
|
|