1. Name and address of project for which the waiver is requested:

Name:

Street:

City:

Zip Code:






Local Building Department Contact Information

















Applicant Information:


2. Name of Applicant. If other than the owner, please indicate relationship of applicant to owner in space provided:


First Name:

Last Name:

Street:

City:



Zip code:

Phone:

Fax:

Email:

Relationship to owner:


Owner Information:


3. Please enter the owner information below. If the owner and the applicant are not the same person, please upload a written authorization by owner in space provided:




Owner First Name:

Owner Last Name:

Street:

City:



Zip code:

Phone:

Fax:

Email:






Project and Facility Type:



4. Please check one of the following:



5. Type of facility. Please describe the building (square footage, number of floors). Define the use of the building (i.e., restaurant, office, retail, recreation, hotel/motel, etc.)







Description:
 The project consists of an elevated press box serving a new ADA compliant high school grandstand, and contains 492 GSF of area. The project replaces the non-compliant grandstand with a new grandstand providing two ADA ramps and a full length circulation aisle leading to 20 ADA and 20 companion spaces. The new press box will replace the existing, outdated press box and maintains a critical pedestrian route below it which connects the baseball facilities.


Construction Cost:



6. Project Construction Cost (Provide cost for new construction, the addition, or the alteration):

Summary:
Estimated cost by two construction managers for the new Press Box and Grandstand project is approximately $4.6 million, including approximately $1 million in site work.

7. Has there been any construction activity on this building during the past three years?


Cost of Construction:

Comments:
Building Official Recommendation upload:




Construction Status:




8. Project Status: Please check the phase of construction that best describes your project at the time of this application. Describe status.



*Briefly explain why the request has now been referred to the Commission.
We were informed by the City of Tampa Construction Services Division that a waiver is required from the FBC + AAC, for exemption of vertical accessibility requirements to a press box which is less than 500 GSF, is greater than 12' above grade, and has bleachers with only one level of entry. Unfortunately, adding an elevator tower will block the only route available between the baseball facilities building and the batting cages and facilities, which is a critical component of the baseball program and no alternative route is possible. Our construction documents are approximately 70% complete. Please see additional docs.


Requirements to be Waived.




9. Requirements requested to be waived. Please reference the applicable section of Florida law. Only Florida-specific accessibility requirements may be waived.

Issue 1: Florida-specific hotel/motel rooms  Minimum height in parking structures  Accessible parking
  Vertical accessibility  Toilet rooms
  Private  Other
Requesting waiver to the Florida-specific requirement that all press boxes must provide vertical accessibility, per Advisory for FBC 206.2.7, regardless of code exceptions that if a press box is less than 500 GSF, is more than 12' above grade, and has bleachers accessible at only one level, then vertical accessibility is not required. Please see additional documentation.



Issue 2: Florida-specific hotel/motel rooms  Minimum height in parking structures  Accessible parking
  Vertical accessibility  Toilet rooms
  Private  Other Need Additional Space
Issue 3: Florida-specific hotel/motel rooms  Minimum height in parking structures  Accessible parking
  Vertical accessibility  Toilet rooms
  Private  Other Need Additional Space

Grounds for waiver.


10. Grounds for Waiver: The Florida Building Commission may grant waivers of Florida-specific accessibility requirements upon a determination of unnecessary, unreasonable or extreme hardship. Please describe how this project meets the following hardship criteria. Explain all that would apply for consideration of granting the waiver.

NOTE:**



1. SITE CONFLICT: The Florida-specific ADA requirement that vertical accessibility be provided for Press Box facilities less than 500 GSF in area, is not possible to implement on our project because the addition of an elevator tower, which would extend from grade level up to 35’+ above grade, will block the current 11’-12’ route between the existing baseball facilities building and the existing baseball batting cages. During scrimmages and practices, the players, coaches and even the maintenance staff must utilize this 11’+/- wide route......see attached "Case for Hardship Waiver" in additional document section.






3. COST: Cost to provide an elevator and tower exceeds the funding established. Project was planned 3 years ago and has been reduced in scope and redesigned several times to meet funding limits and increased costs in construction. Current cost estimates are as follows: Press Box, Grandstands and sitework is approximately $4.6 million. The cost for an elevator tower enclosure of similar construction, approximately 30’ in height, is estimated to exceed $500,000, and will also require complete redesign of the project. Please note that we have been reducing project scope for 3 years to work within our limited budget which is entirely funded by donations. The requirement for......see attached "Case for Hardship Waiver" in additional document section.
Cost Estimates For Compliance:










Licensed Design Professional Comments.


11. Licensed Design Professional: Where a licensed design professional has designed the project, his or her comments, including his or her signature and professional seal, MUST be uploaded.




Comments:
We have been working on this project for over 3 years. It has stopped and started numerous times due to budget restrictions. For the first two years of design it was our understanding that the code allowed the press box to be built without an elevator provided 3 criteria were met. We made sure that we met this criteria for two very important reasons: 1) An elevator tower would block the existing, critical pedestrian/ golf cart route which passes under the existing press box and lies within an 11'-12' wide space between the football grandstands and the baseball outfield fence. This path connects the baseball facilities building with the batting cages. 2) The project is already challenged by budgetary limits and the requirement for an elevator tower would permanently kill the project.

Design Professional First Name:
Design Professional Last Name: Street Address: City: State:

Zip: Email Address: Phone:


Additional Documentation.


12. Upload Additional Documentation: Please upload any documentation such as plans, photographs, or anything that will assist the Council and the Commission to determine the appropriate resolution of your request.