|
|
| 48109.1 |
Elevate Modified Bitumen Roof Systems (HVHZ) |
SBS modified bitumen roof systems for use in FBC HVHZ jurisdictions. |
Limits of Use Approved for use in HVHZ: Yes Approved for use outside HVHZ: No Impact Resistant: N/A Design Pressure: +N/A/-350 Other: 1.) The design pressure in this application relates to one particular system. Refer to the PEER Appendix for all systems and allowable design pressures. 2.) Refer to PEER Section 5 for other Limits of Use. |
Installation Instructions FL48109_R1_II_2026_06_09_FINAL_A1_PEER-AMZ-002.B_ELEVATE MB_HVHZ_FL48109-R1.pdf Verified By: Robert Nieminen PE-59166 Created by Independent Third Party: Yes Evaluation Reports FL48109_R1_AE_2026_06_09_FINAL_PEER-AMZ-002.B_ELEVATE MB_HVHZ_FL48109-R1.pdf Created by Independent Third Party: Yes |
|
|
| 48109.2 |
Elevate Modified Bitumen Roof Systems (NON-HVHZ) |
SBS modified bitumen roof systems for use in FBC NON-HVHZ jurisdictions. |
Limits of Use Approved for use in HVHZ: No Approved for use outside HVHZ: Yes Impact Resistant: N/A Design Pressure: +N/A/-350 Other: 1.) The design pressure in this application relates to one particular system. Refer to the PEER Appendix for all systems and allowable design pressures. 2.) Refer to PEER Section 5 for other Limits of Use. |
Installation Instructions FL48109_R1_II_2026_06_09_FINAL_A1_PEER-AMZ-002.A_ELEVATE MB_NON-HVHZ_FL48109-R1.pdf Verified By: Robert Nieminen PE-59166 Created by Independent Third Party: Yes Evaluation Reports FL48109_R1_AE_2026_06_09_FINAL_PEER-AMZ-002.A_ELEVATE MB_NON-HVHZ_FL48109-R1.pdf Created by Independent Third Party: Yes |