Description:
Existing and New are F-2 occupancy building (metal fabrication). A 47,208SF pre-engineered metal building will be built to encompass an existing 29,430sf pre-engineered metal building. A new automatic sprinkler system will be installed throughout existing and new areas.
*Briefly explain why the request has now been referred to the Commission.
The existing building will not take on renovation except for the new sprinkler system. When designing the possibility for new elevator / lobby, we came across multiple conflicts in order to achieve a successful floor plan. Placing an elevator with direct access from the main entry interrupts the egress path through the grand entry stair and will intercept the egress path from each side of the building. Because the egress path cannot run through this potential elevator lobby we would then need to provide an additional egress path on each side of the building. We are now in need to create new exterior penetrations which can ultimately lead to building envelope failure.
Requirements to be Waived.
Issue 1:
Florida-specific hotel/motel rooms
Minimum height in parking structures
Accessible parking
Vertical accessibility
Toilet rooms
Private
Other
The existing building will not take on renovation except for the new sprinkler system. When designing the possibility for new elevator / lobby, we came across multiple conflicts in order to achieve a successful floor plan. Placing an elevator with direct access from the main entry interrupts the egress path through the grand entry stair and will intercept the egress path from each side of the building. Because the egress path cannot run through this potential elevator lobby we would then need to provide an additional egress path on each side of the building. We are now in need to create new exterior penetrations which can ultimately lead to building envelope failure.
Issue 2:
Florida-specific hotel/motel rooms
Minimum height in parking structures
Accessible parking
Vertical accessibility
Toilet rooms
Private
Other
Need Additional Space Issue 3:
Florida-specific hotel/motel rooms
Minimum height in parking structures
Accessible parking
Vertical accessibility
Toilet rooms
Private
Other
Need Additional Space
Grounds for waiver.
NOTE:**
The existing building will not take on renovation except for the new sprinkler system. When designing the possibility for new elevator / lobby, we came across multiple conflicts in order to achieve a successful floor plan. Placing an elevator with direct access from the main entry interrupts the egress path through the grand entry stair and will intercept the egress path from each side of the building. Because the egress path cannot run through this potential elevator lobby we would then need to provide an additional egress path on each side of the building. We are now in need to create new exterior penetrations which can ultimately lead to building envelope failure. Besides the exterior penetrations, in order to install this potential elevator, the floor slab would need to be cut and dug